Appendix 9
Abatement Notices

Date
Location
Material
12/23/2002
Meat Lab - WSU

Boiler Insulation - 50 sq. ft.
11/12/2002

Steam tunnel - WSU


Mag. Pipe insulation - 60 ln. ft.
8/2/2002

Steam tunnel, Grimes Way - WSU


Mag pipe insulation - 35 ln. ft.
7/31/2002

Engineering Lab Building - WSU


9x9 floor tile, mastic, mag. pipe insulation - 1,000 sq.ft., 300 ln. ft.
7/8/2002

Community Hall - WSU


RToofing Tile - 8,000 sq. ft.
3/22/2002

McCluskey Service Bldg - WSU


Mag. Pipe/boiler insulation - 100 In. ft.
11/8/2001

Engineering Lab - WSU


Mag. Pipe insulation - 30 In. ft.
10/4/2001
General Campus Utility Tunnel - WSU

Mag. Piple insulation - 25 In. ft.
9/27/2001
McCoy Hall - WSU

Floor tile and mastic - 10 sq. ft.
8/30/2001
Dana Hall - WSU

Floor tile and mastic - 300 sq. ft.
8/6/2001
Central Stores Warehouse - WSU

Floor tile - 400 sq. ft.
7/31/2001
Plant Sciences Greenhouse #114 - WSU

Boiler insulation - 100 In. ft.
7/23/2001
Environmental Health Building - WSU

Roofing material - 30 sq. ft.
7/11/2001
Steptoe Village Building #F - WSU

Boiler insulation - 10 sq. ft.
6/29/2001
Orton Hall - WSU

Floor tile and mastic - 11,264 sq. ft.
5/32/2001
Energy Plant - WSU

Boiler insulation - 64 sq. ft.
4/19/2001
Dana Hall - WSU

Pipes - 40 In ft
4/14/2001
Lindon Cottage - WSU

Floor tile and mastic - 1597 sq. ft.
3/23/2001
Fulmer Hall - WSU

Floor tile and mastic - 150 sq. ft.
2/28/2001
Dana Hall - WSU

Floor tile and mastic - 150 sq. ft.