| Date of Exposure Monitoring: | 3/5/02 |
| Location of Worksite: | Webster Hall |
| Description of Task: | Sweeping dust from 3% chrysotile floor tiles |
| Type of Material Involved in Task: | floor tile |
| Asbestos Content of Material Involved in Task: | 3% chrysotile |
| Environmental Controls: | ___ Exhaust Hood: |
| ___ Local Circulating Fan: | |
| ___ Other: | |
| X None |
| Environmental Conditions: | ___Rain/Snow |
| X Dry | |
| ___ Humid | Temperature: ___ <50°F X 58-80°F ___ >80°F |
| Work Practices: | Wet Methods |
| HEPA Vacuuming | X Other: Sweeping |
| Area ID # | Exposure Monitoring: | <0.08 | f /cc | |
| Employee ID # | Exposure Monitoring: | f /cc | ||
| Exposure Monitoring: | f /cc | |||
| Exposure Monitoring: | f /cc | |||
| Exposure Monitoring: | f /cc | |||
| Previous Monitoring Result: | NONE | Date: N / A | N / A | f /cc |
| Date: | f /cc | |||
| Date: | f /cc |